Alimak elevators providing access to chimneys

07 October 2015 by

A pair of Alimak rack and pinion elevators were installed to provide vertical access to two chimneys at the 1300 MW Abu Qir thermal power plant, outside Alexandria in Egypt.

The Abu Qir Power Plant project is a Thermal, dual fuel fired (natural gas and mazout), power plant with a production capacity of 1300 Megawatt located on the Mediterranean coast 25 km west of Alexandria City.

Available Downloads

  • Alimak elevators providing access to chimneys

    Download

Linkedin Linkedin   
Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.