Following a decision to accept fat, oils and grease from local restaurants, resulting in a boost in biogas production, the City of Gresham Wastewater Treatment Plant (WWTP) was able to install a second Cat genset. This, in combination with a solar array, enabled the facility to generate more power than it consumes. Achieving and maintaining this energy net zero status over several years has only been possible because of the high uptime of the gensets.


Located near the Columbia River north east of Portland, Oregon, USA, the City of Gresham Wastewater Treatment Plant (WWTP) is a basic secondary activated sludge facility that receives an average of 13 million gallons/day (mgd) of waste.

Dating back almost 30 years, efforts were made to curb the plant’s big appetite for power. Anaerobic digesters were installed at the plant in 1990 in an effort to make the plant more efficient by deriving biogas from the solid waste matter that settles out during the treatment process. Raw, untreated biogas derived from the digesters fed a 250 kW generator that helped power about one quarter of the plant.

“We wound up turning it off in 2002 when it burned out,” recalls Alan Johnston, senior engineer with the facility. In 2005, after receiving grants from the Energy Trust of Oregon and the Oregon Department of Energy, the City installed a Cat® G3508 gas generator set that produces 400 kW in a combined heat and power (CHP) configuration. The cogeneration system included a biogas scrubbing system that removes moisture, hydrogen sulphide and siloxanes.

The Cat genset produces power and heats the buildings with jacket water heat. It has been supplying 50% of the treatment plant’s power needs since 2005, saving about $250 000 in annual avoided electricity costs. But even with the addition of the Cat 400 kW cogeneration unit, excess biogas had to be flared, Johnston says.

In 2007, Gresham’s mayor, Shane Bemis, signed a climate action agreement with the US Conference of Mayors, which ultimately led Johnston to examine ways to make the treatment plant even more energy efficient.

Towards energy independence

After further analysis, Gresham decided to shift its focus in 2008-09 to reduced power consumption while increasing biogas production.

The journey to energy independence began in 2009 when the Gresham WWTP received a grant from the Oregon Economic Development Commission to study ways to increase the environmental and operational efficiency of the treatment plant. One outcome was a study of the benefits of accepting fats, oils and grease (FOG) from restaurants to remove them from the waste stream and instead use them to boost electrical generation.

Based on revenues generated by a FOG tipping fee at the facility and avoided electrical utility fees, the conclusion was that it would be cost-effective, with a payback time of seven years. Gresham acted on the recommendation, and currently takes in about 30 000 gallons per day of FOG. The product is slowly injected into the digesters, and according to Johnston, the organic matter has nearly doubled biogas production.

“FOG has a lot of energy stored in it, or about 12 cubic feet of biogas produced for every gallon injected into the digesters”, Johnston says. “The study concluded that adding FOG receiving facilities is economically viable, and it turns out that there is a market for this service in our area.”

Energy net zero means producing the same amount of energy that a facility uses to operate. For Gresham, energy net zero became a real goal in 2010 when investments were made as part of the capital improvement cycle. A formal energy management team was created, and Gresham established a goal of achieving energy net zero at the WWTP by 2015.

The increase in biogas production made possible the installation of a second Cat G3508 gas generator set in 2015, thereby increasing power output and allowing the facility to operate on its own, independent of power from the utility grid.

With support from management and staff, five major capital upgrades were phased in over a five-year span.

In February 2015, on schedule and on budget, the first energy net zero month occurred. The WWTP generated more electrical energy on site from renewable biogas cogeneration and solar power than it consumed. Today, the Gresham WWTP generates about 10 percent more electricity than it needs via a combination of energy efficiency, codigestion and cogeneration, and a solar array.

“We didn’t do it just because it was fun and exciting, we did it because it made financial sense,” Johnston says. “That’s how the City of Gresham operates, and we had shown over 10-year period we’d have a seven-year payback on all of these projects, and that’s really what sold it to the mayor.

“We’ve had a ton of support — all the way from my bosses to managers to the city council and mayor through all of these projects — and I’m glad it was so successful because I pushed it for years saying it would work, and it has.”

Over the ten year journey to energy net zero, the Energy Trust of Oregon supported the City of Gresham with technical assistance, project development support, and cash incentives that lowered the costs of the energy efficiency measures — as well as the two CHP generator sets and the facility’s solar array. Business Energy Tax credits and biomass incentive funds from the State of Oregon were also essential to making net zero a reality.

Engine uptime is the key

Now entering its fifth year of operation as a net zero wastewater treatment plant, Gresham is the first facility of its kind in the Pacific Northwest and the second in the USA to hold that distinction.

The net result is about $1 million in annual savings to the ratepayers of Gresham, which includes $500 000 in avoided utility costs, $350 000 from FOG tipping fees, and the balance in avoided costs by utilising the jacket water heat from the generator sets to heat the buildings.

As an added benefit, Class B biosolids that are the byproduct from the anaerobic digesters are applied to agricultural fields as fertiliser at no cost to area farmers.

“When you talk about our wastewater treatment, which traditionally has been our biggest energy hog, in less than ten years it’s producing its own energy on site,” Bemis says. “So it’s not only green in terms of green energy, it’s green in terms of money.”

Achieving net zero status is made possible by the high uptime of the Cat gensets, Johnston says. To ensure continuous operation, Gresham relies on its Cat dealer, Peterson Power Systems, which provides service through a customer support agreement.

“One of the big reasons why we have a successful programme here is because of the relationship we have with our local Cat dealer, Peterson,” he says. “Any time we have issues with the engines, we call them, and we have a guaranteed 24 hour interval for their technicians to come out here to fix the problem.”

Over four years, Gresham’s cogeneration plant has averaged about 95% uptime. “And we couldn’t have done that without the support of Peterson Power Systems,” Johnston says. “If the Cat engines aren’t running, we’re in trouble. So, we try to average over 90% run time, and in over four years we’re at 95% and that includes all the overhauls, top end work, oil changes, and unrelated construction issues that take those engines down.

“So really, it’s a pretty impressive thing when you think about it — if the engines run 80% of the time, we’re not net zero,” Johnston adds. “It’s always easy in the honeymoon phase of big projects to have engines running good and everybody’s happy, but to have done it now for four years with all the issues you run into with older equipment, it’s pretty impressive.” 

The City of Gresham Wastewater Treatment Plant
FOG storage tank at Gresham
Caterpillar gensets at Gresham


Linkedin Linkedin   
Privacy Policy
We have updated our privacy policy. In the latest update it explains what cookies are and how we use them on our site. To learn more about cookies and their benefits, please view our privacy policy. Please be aware that parts of this site will not function correctly if you disable cookies. By continuing to use this site, you consent to our use of cookies in accordance with our privacy policy unless you have disabled them.