On December 15, 1999, the UK’s National Grid met a record demand for power of 50 197 MWe. This was the first time UK demand exceeded 50 000 MWe.
Independent coverage of power generation since 1981
On December 15, 1999, the UK’s National Grid met a record demand for power of 50 197 MWe. This was the first time UK demand exceeded 50 000 MWe.