UK technology transformation consultancy Softwire is collaborating with National Grid Electricity Distribution on a Network Innovation Allowance (NIA) funded project to develop and test a proof of concept using drone imagery and machine learning to assess the condition of pole-mounted transformers.Â
The project is exploring how aerial imagery, AI, and computer vision can automate the condition assessment process, identifying corrosion and other visible defects to produce consistent asset condition data. This is aimed at helping improve asset health reporting, targeting maintenance more effectively, and reducing the cost and effort associated with manual inspections and assessments. Detecting deterioration in transformers earlier could allow NGED to act before transformers fail, avoiding unplanned power cuts, particularly in rural communities.
Trial locations for the project have been selected across NGED’s network regions, including remote and rural areas, to capture a representative range of asset conditions. Drone inspection specialists Team UAV has captured high resolution images of 500 pole-mounted transformers, and is developing the computer vision models and a prototype web application to present the results.
Working with NGED specialists, Softwire’s data science team will label the images and train models to assess asset condition. The team will also consider how factors including weather, light, location and seasonal variation could affect model performance, and ensure the training and test data represent the range of conditions captured during the trial.
The prototype application is expected to map its condition assessments, confidence levels and supporting rationale against the Common Network Asset Indices Methodology, the standard used by electricity networks to assess asset health and risk. This could support future reporting to regulator Ofgem through the Network Asset Risk Metrics framework during Electricity Distribution 3 (ED3), the next period for which Ofgem will set funding and performance requirements for local electricity networks. The model could later be expanded to assess a wider range of conditions and support a predictive approach to maintenance, reducing costs and improving network reliability.
The initial phase is due to be completed by the end of 2026. It will include the trained proof-of-concept model, prototype web application and guidance for future drone image collection.