Reducing bushfire risk: TasNetworks has it covered
As climate change continues to challenge the resilience of Tasmania’s electricity distribution network and increases fire risk, network operator TasNetworks is responding by deploying Amokabel’s New Generation Covered Conductor (NGCC) for overhead lines. Experience with initial installations has proved positive. By Branden Papalia, Senior Lines Engineer at TasNetworks