The plant, which will be located in Maqueda, is expected to come into operation during the second quarter of 2008 and includes the use of water from the Waste Water Purifier Plant (EDAR) at Guadalhorce, for the plant’s cooling system.
Contracts for the EPC on the development have not be confirmed.