The Netherlands has opened tenders for the IJmuiden Ver Gamma-A and Gamma-B offshore wind sites, which can each accommodate 1 GW of generating capacity and together represent up to 2 GW of new offshore wind capacity.
The tender launch begins the process of selecting developers to build and operate projects at the two designated sites, as the Netherlands continues to expand offshore generation in the North Sea.
Gamma-A covers 129km2 and is located approximately 53km off the Dutch west coast, while Gamma-B covers 95km2 around 61km offshore. Their scale reflects the growing size of offshore wind projects and the Netherlands’ reliance on large North Sea developments to increase renewable electricity generation.
Both wind farms will share a 2 GW offshore platform operated by transmission system operator TenneT. The platform will connect the projects to the Dutch electricity grid via a direct-current link, bringing power ashore at Maasvlakte.
The Netherlands Enterprise Agency (RVO) is managing the permitting process, with permits for both projects expected in the first quarter of 2027. The wind farms are scheduled to enter operation in 2032.
The tender process will determine which developers secure the rights to develop the two sites, with construction schedules and final investment decisions expected to follow the awards.
The tender comes as offshore wind developers across Europe face challenging market conditions, including higher project costs, supply-chain constraints and growing requirements for integration with electricity grids and other energy infrastructure.
The Gamma projects form part of the Netherlands’ longer-term offshore wind programme and are expected to contribute to the country’s electricity supply as it expands renewable generation and reduces reliance on fossil fuels.