Series production of the glass-fibre-reinforced epoxy resin rotor blades is scheduled to start in the first half of 2007.
Related ArticlesFPL Energy orders Siemens wind turbines Texas snaps up 70 Siemens wind turbines
Independent coverage of power generation since 1981
Fort Madison in Iowa is to be the site for Siemens’ US wind turbine blade manufacturing site for its 2.3 MW machines.
Series production of the glass-fibre-reinforced epoxy resin rotor blades is scheduled to start in the first half of 2007.
Related ArticlesFPL Energy orders Siemens wind turbines Texas snaps up 70 Siemens wind turbines