450 MW of recip engines to support UK grid stability
The Thurrock-based plant will be one of the world’s largest gas fuelled high-speed piston engine based peaking power stations, and is scheduled to start operating in late 2026.
Independent coverage of power generation since 1981
The Thurrock-based plant will be one of the world’s largest gas fuelled high-speed piston engine based peaking power stations, and is scheduled to start operating in late 2026.